Results of Emission Monitoring

2017-11-20

423

#

Emission from 13.11.2017 to 20.11.2017

Emission MPE, %
long-lived nuclides 0.0248
Inert gases 0.0755
Iodine 0.0009

Ionizing radiation background on the industrial site and adjacent area has not changed. Its level corresponds to normal operation of the units and does not exceed natural background values
Information Centre of SE KhNPP
Daily Information on Khmelnitsky NPP Operation

2017-11-20

422

#

On November 20, Khmelnitsky-1 has been in outage for 14 days. On November 7, 2017, Khmelnitsky-1 was disconnected from the grid for middle maintenance, which should be completed in 96 days.

Khmelnitsky-2 operates at 1010 MW power. Over the past day, the power unit generated 24.29 million kWh of electricity, and 461.43 million kWh of electricity has been generated since the beginning of the month.

Radiation situation on the site and adjacent areas has not changed, and remains at the level corresponding to normal operation of power units, and does not exceed natural background values.
Information Centre of SE KhNPP