OPERATIONAL DATA

Performance Indicators

controlled area as of 23:27 (2020-01-22)
Енергоблок №1
0.0 МВт
Енергоблок №2
1009.4 МВт
Performance Indicators

Radiation Environment

controlled area as of 23:26 (2020-01-22)
Central RMP
0.10 μSv/h
Netishyn
0.11 μSv/h
Radiation Environment

Meteorological Condition

controlled area as of 23:26 (2020-01-22)
Air temperature
* °C
Wind speed
* m/s
Relative humidity
* %
Atmospheric pressure
* gPa
* - Maintenance of control post.
Meteorological Condition

IMPORTANT

News

Старшокласники регіону знайомляться з атомною енергетикою

More

News

Medical insurance for Khmelnitsky NPP staff introduced

More

News

Хмельницька атомна електростанція виконала план з виробництва електроенергії у грудні 2019 року

More

News

Т.в.о. президента Енергоатома Павло Павлишин провів робочі наради на Хмельницькій АЕС

More

LATEST MESSAGES

Daily Information on Khmelnitsky NPP Operation

published 2020-01-22

Today, on January 22, Khmelnitsky 2 is at 1011 MW power. 24.3 million kWh of electricity was generated during the past 24 hours. 510,7  million kWh of electricity has been generated since the beginning of the month. Khmelnitsky 1 has been in middle overhaul for 423 days. Start-up operations ar ...

KhNPP production indicators

published 2020-01-22

...

Daily Information on Khmelnitsky NPP Operation

published 2020-01-21

Today, on January 21, Khmelnitsky 2 is at 1011 MW power. 24.32 million kWh of electricity was generated during the past 24 hours. 486.4  million kWh of electricity has been generated since the beginning of the month. Khmelnitsky 1 has been in middle overhaul for 422 days. Start-up operations a ...

KhNPP production indicators

published 2020-01-21

...

Environment Condition in December, 2019

published 2020-01-21

According to the researches, the water level in the Goryn River (above the Baltic Sea level) fluctuated within a month from 192.58 m to 192.59 m in December, 2019 (the minimum value is 192.57 m; the maximum value is 192.61 m; the average is 192.59 m): In December 2019, the temperature of water in th ...

Daily Information on Khmelnitsky NPP Operation

published 2020-01-20

Today, on January 20, Khmelnitsky 2 is at 1009 MW power. 24.33 million kWh of electricity was generated during the past 24 hours. 462.08 million kWh of electricity has been generated since the beginning of the month. Khmelnitsky 1 has been in middle overhaul for 421 days. Ionizing radiation backgr ...

KhNPP production indicators

published 2020-01-20

...